25,000 LPH Rooftop Two-Stage RO Plant
For an industrial facility in Bhavnagar, Aim Enviro designed, installed, and commissioned a 25,000 LPH two-stage rooftop Reverse Osmosis plant engineered for high water recovery.
Location
Bhavnagar, Gujarat
Capacity
25,000 LPH
Category
Reverse Osmosis
Overview
25,000 LPH Two-Stage RO Plant
The facility needed a rooftop-installed RO system capable of reliably supplying process water at scale. Aim Enviro engineered a 25,000 LPH two-stage Reverse Osmosis plant: Stage 1 uses 3 pressure tubes for primary separation, with the concentrate routed into a Stage 2 array of 2 pressure tubes for additional permeate recovery.
The two-stage pressure tube design achieves approximately 75% water recovery, and the system was successfully installed, commissioned, and handed over on the facility's rooftop.

Scope of Work
What We Delivered
- Water quality assessment and RO system design for 25,000 LPH capacity
- Design of a two-stage pressure tube configuration (3 PT + 2 PT)
- Rooftop installation and commissioning of the RO plant
- Performance testing and handover of the completed system
Technologies Used
At a Glance
Project Specifications
Location
Bhavnagar, Gujarat
Capacity
25,000 LPH
Recovery Rate
~75%
Configuration
Stage 1: 3 Pressure Tubes → Stage 2: 2 Pressure Tubes
Core Goals
- Deliver 25,000 LPH of process water via a rooftop-installed RO plant
- Achieve approximately 75% water recovery within a space-constrained rooftop layout
- Commission and hand over a fully operational system
Key Challenges
- Designing a compact two-stage RO layout suited to rooftop installation
- Balancing feed pressure across the 3 PT (Stage 1) and 2 PT (Stage 2) arrays
- Coordinating rooftop logistics for equipment installation and commissioning
Process
System Configuration
Feed Water
Sand Filter & Carbon Filter
Bag Filter & Cartridge Filter
RO Stage 1 (3 Pressure Tubes)
RO Stage 2 (2 Pressure Tubes)
Permeate (~75% Recovery)
Highlights
- Pressure tube configuration (3 PT + 2 PT) engineered specifically for ~75% recovery
- Compact two-stage layout designed for rooftop installation constraints
- Installation and commissioning coordinated for rooftop site logistics
How We Work
Our Project Execution Methodology
Requirement Analysis
Understanding water quality, capacity, and application requirements for the project.
Water Testing & Site Study
Sampling and analyzing raw water or effluent, and assessing site conditions and constraints.
Design & Engineering
Detailed process design, equipment sizing, and engineering drawings tailored to the project.
Equipment Selection
Sourcing and specifying equipment matched to capacity, technology, and site requirements.
Installation & Commissioning
Mechanical and electrical installation, system integration, and trial runs.
Performance Testing
Validating output quality and system performance against design targets.
AMC & O&M Support
Ongoing maintenance, monitoring, and operational support after handover.